Cycling Route Map Principles
A course map has two readers: the rider at speed and the resident at the barrier. One needs the next junction, the next feed and the start of the climb. The other needs the closed street, the time it reopens and the way around on foot.
The road book closes on Thursday, and both the riders and the people who live along the course will read whatever comes out of that file.
Two readers open the same map. A rider looks at it for a second at speed and needs the next junction, the next feed and the start of the next climb. A resident stands at a barrier with a bag of shopping and needs to know which street is shut, until when, and which way to walk around it. A course map that answers only the first reader leaves the second one asking a marshal.
Give each distance its own line
Most events put three distances on one map: a short loop, a middle course and a long one that uses both. The overlap is where maps fail. Draw the shared section once, split the lines where the courses separate, and put a marker at that junction with the distance on it. A rider who misses the split has lost the day, so the junction deserves a bigger marker than the feed zones.
Set the line width for the viewing distance. A hairline looks right on a laptop and disappears in a glance from a bike. Add arrows for direction, and choose colours that survive being photocopied for the marshal pack.
Tasmap routes carry their own colour, width, line style and arrows. Set the three lines once, and the same three appear in the road book, on the website and on the board at the split.
Two markers are enough for a climb
A rider wants to know where the road tilts up, how long it stays up, and what comes after the summit. Place a point at the foot and a point at the top, and put the length and the average grade in the point's content, copied from the survey behind the road book. Two markers per climb will do. A summit flag on every bend teaches nobody anything.
The descent deserves the same care. Mark the sharp bend at the bottom, the level crossing, and the cattle grid if the course has one. Those are the places where riders come off, and the marshal standing there should find the same spot on the same map as the feed zone.
A feed zone has a side
Feeding a cycling race happens at speed. Riders approach from one side, take a bag or a bottle, and throw the empty into the verge. Write the side into the point's content: which side the hand-up is on, what is handed up, and where the litter zone ends. A feed zone described without a side sends half the field across the road.
The UCI road race regulations treat the feed zone as a marked, signposted place: a maximum length, a minimum space per team, staff on foot on one side of the road, and waste zones before and after. The technical guide also has to list feed points and obstacles. A map that draws the feed as a point without those details is less precise than the document it came from.
Residents need the same zone read differently. A feed takes a lane and a footpath for a window. Put those hours into the point's content and into the article, then check that the barrier crew has the same numbers as the map.
The closure notice sits on the same file
The resident reads the closed stretch, the junctions that stay open and the time the road comes back. Draw the closed stretch as its own line in a colour no racing line uses. Where the course crosses a junction, the notice has to say whether that junction closes or stays controlled.
Tasmap exports PNG, JPEG, WebP or PDF from the Classic layout, from A4 up to A0 at 300 DPI. One file then covers three jobs: A3 for the notice board at the barrier, A4 for the letter through the door two weeks out, and a small file for the club's social post.
Keep the closure line and the course line in that one file. When the finish moves a few hundred metres, both get corrected the same afternoon.
What the marshal pack has to survive
The marshal pack gets printed, folded and left in a car overnight. Test it that way. Print at the size it will be used, check the smallest label at arm's length, and check that the split still reads in black and white.
Two things belong on the pack beyond the map: the radio channel, and the nearest point where the sweep vehicle can collect a rider. Marshals ask for those first.
References
- UCI Cycling Regulations, Part 2: Road Races, Union Cycliste Internationale. Feed zones, course marking, technical guide contents and event safety roles.
- Road marshals and the British Cycling accredited marshal scheme, British Cycling. Static safety marshal roles and the Department for Transport approved stop sign used at junctions.
Related reading
- GPX Tracks, Waypoints and Routes Compared
- Drawing Routes That Read Clearly
- Maps for Public Transit Detours
The road book, the notice at the barrier and the marshal sheet can all come out of one file. Tasmap exports that file at the size each one needs.